Departmental savings requirements
1. Save electricity, insist on turning off lights when people go, turn off computers as required, use air conditioners rationally, and save energy.
2. Save paper, use both sides of copy paper when outputting sketches; make full use of the network and OA for file transfer, increase the proportion of paperless offices, and can be solved with electronic files, without printing, and eliminate waste.
3. Strictly control the consumption of office supplies and keep them within the scope of reasonable use.
4. Carefully use and keep calculators, set squares and other tools to avoid unnecessary economic losses.
Specific measures for sheet metal process cost control
1. Strict cost control during the process transformation design, and found that the design drawings are complicated and costly, and the designers are notified in time to change the design to reduce the overall cost of the structure or components.
2. Strict cost control when preparing the material extraction quota, and often contact the workshop, warehouse, and supply to understand the inventory situation in light of the situation and the plate market, make full use of the remaining materials in the workshop and warehouse, minimize the batches of new materials, and try to control the width of the new materials, and increase the narrow width of the materials as much as possible.
3. Use the cutting software to carry out reasonable cutting, improve the utilization rate of materials, and stipulate the material utilization of sheet metal technicians utilization rate authority is 93%. Those who are higher than this standard will be given surplus rewards according to regulations, and this policy will improve the subjective initiative of the craftsperson.
4. Pay attention to the process development method, and find that the unfolding pattern is not conducive to the use of materials, and the process method can be changed reasonably if necessary, use CAD for manual splicing and cutting.
5. Make full use of the sheet metal process standard atlas, save time and effort, and reduce the number of drawings output, which can be a certain process play a role of saving to a degree.
6. The technical department often discusses and learns with other companies, participates in academic seminars and various exhibitions, and improves the comprehensive ability of the body, the use of better process technology, process plan for process transformation and guidance workshop production.